#22. When is the proper time for the employee’s to receive training on the company fall arrest system?
#23. Gauges not accurate to within _______ percent of the full scale shall be recalibrated or replaced?
#24. Where can the referenced publications that are used to create NFPA 25 be found?
#25. At what minimum interval should exposed pipe, fittings, and sprinkler heads be visually inspected?
#26. Hose Connection
#27. Remove
#28. When should antifreeze systems be tested?
#29. Orifice Plate Proportioning
#30. What is a fire service main?
#31. Automatic Transfer Switch
#32. Dry pipe systems are allowed to be kept wet during non-freezing weather under what circumstances?
#33. What type of valve is designed for the purpose of reducing downstream water pressure under both residual and static conditions?
#34. What type of test shall be provided when a valve is returned to service to determine that the valve is open?
#35. At what frequency should vane type and pressure type water flow devices be tested?
#36. Alarm Receiving Facility
#37. An informational sign shall be placed at the _______ supplying the antifreeze loop, dry system, pre-action system, or auxiliary systems control valve
#38. Emergency Impairment
#39. If an explosive actuated tool misfires, you should?
#40. What is Table 6.1.1.2?
#41. Monitor Nozzle
#42. Line Proportioner
#43. Shall
#44. Are buildings with multiple wet pipe systems required to have all systems internally inspected at the same time?
#45. Double Check Valve Assembly
#46. Should
#47. During testing of a diesel engine driven fire pump system, the fire pump is running at a low RPM. This is considered a ________?
#48. Which of the following would be an acceptable material for the information sign to be made of?
#49. Name the system that utilizes a plate through which passes a specific amount of foam concentrate at a specific pressure
#50. ITM Service
#51. At what point on the antifreeze system should the test sample be taken?
#52. Sidewall Sprinkler
#53. Listed
#54. Are fire hydrants required to be lubricated?
#55. Which of the following signs require a quarterly inspection to verify that it is securely attached to the sprinkler riser?
#56. PIV and OS&Y shall be backed al__________ turn from the fully open position to prevent jamming
#57. When are manual wet pipe standpipe systems not required to be hydrostatically tested?
#58. Units
#59. What is the minimum time that a fire hydrant should be flowed?
#60. What type of testing requires the use of a refractometer?
#61. “Shall” Indicates what?
#62. Are dry barrel hydrants required to be pumped out after flow testing?
#63. Rebuild
#64. Approved
#65. Scaffolding and components shall be capable of supporting a weight of?
#66. What portion of the fire department connection is required to be hydrostatically tested?
#67. Wall Hydrant
#68. Noncritical Deficiency
#69. Bladder Tank Proportioner
#70. Replace
#71. Sprinklers shall be tested for sensitivity and functionality at ______ PSI
#72. Concealed Sprinkler
#73. Hearing protection is required when the noise level reaches 90 DBA for a duration of ____ hrs?
#74. When test results show that the premix antifreeze solution is at the incorrect freeze point, what action shall be taken?
#75. How often shall the system information sign be tested?
#76. What components of a fire hydrant are required to be lubricated?
#77. When using a grounded power tool you find an available extension cord (2-wire). What should you do?
#78. Are alternative nondestructive examination methods for internal obstructive inspections permitted?
#79. Standard Pressure Proportioner
#80. When should the vortex plate on a water storage tank be visually inspected?
#81. Performance Based Program
#82. At what time intervals should check valves be internally inspected?
#83. Which of the following is required for locks and tags used in a lockout/ tagout procedure?
#84. Standard
#85. A building has 3 different types of sprinklers. How many sprinkler wrenches are required to be kept on premises?
#86. When are hard hats required on the job sites?
#87. Inspection
#88. What is the frequency for testing the hose connections for pressure reducing and relief valves?
#89. Internal examination of sprinkler pipe shall be performed at what areas while conducting an obstruction investigation and prevention?
#90. What type of device is used to test flow rates?
#91. Some water storage tanks are equipped with heaters
#92. At what interval should a steel water storage tank with no corrosion protection be visually inspected internally?
#93. Foam Concentrate
#94. Repair
#95. Sprinklers installed in areas that are inaccessible for safety considerations, due to process operations ____ be ____ during each scheduled shutdown?
#96. Scope
#97. What chapter outlines the General requirements of NFPA 25?
#98. Normally closed valves shall be secured by the means of a seal or, be ________ in accordance with the applicable NFPA standard
#99. On what type of systems can possible ice obstructions be found?
#100. Response Time Index (RTI)
#101. Automatic Operation
#102. What chapter of NFPA 25 sets out the administration or scope?
#103. At what time interval(s) should water storage tank level indicators be tested for accuracy?
#104. What are the two types of deficiencies identified in NFPA 25?
#105. At what interval should the interior of water storage tanks be visually inspected if constructed of steel with a corrosion barrier or of other approved/listed material?