Water-Based Systems Layout I (105 questions) VERSION A

 

Results

#1. A water flow test was conducted using 2 hydrants. Both 2 1/2″ outlets were used on hydrant #1 while one outlet was used on hydrant #2. The pitot reading at each hydrant was 12 psi. If the discharge coefficient is 0.7, what is the total water flow (gpm) during this test?

#2. All records shall be maintained by?

#3. A high-rise building where the floor of an occupiable story is greater than _____ above the lowest level of fire department vehicle access

#4. Wet barrel hydrants shall be inspected ___________ after each operation?

#5. The diesel pump shall run a minimum of?

#6. Sprinklers manufactured using fast-response elements that have been in service for 20 years shall be?

#7. Pressure tanks that have their air pressure source supervised in accordance with NFPA 72, National Fire Alarm and Signaling Code, shall be inspected?

#8. Calculate the equivalent length of 4 in. Schedule 40 Black steel pipe of a 90-degree long turn elbow

#9. ________ indicates a mandatory requirement according to NFPA definitions

#10. How long should subsequent records be retained?

#11. When the gauge near the compressor is reading higher than the gauge near the dry pipe valve, the air line shall be what?

#12. Listed

#13. Gauges not accurate within 3 percent of the full scale shall be?

#14. The information sign shall be inspected?

#15. When using a grounded power tool you find an available extension cord (2 wire). What should you do?

#16. Where air pressure supervision is connected to a constantly attended location, gauges shall be inspected?

#17. Fire Department Connection

#18. What specialized equipment is needed to test waterflow alarm devices on a wet pipe system?

#19. Sprinklers shall not show signs of the following?

#20. The owner’s information certificate indicates the property to be protected will contain nitrate film. Which of the following is also required to be provided?

#21. Critical Deficiency

#22. All penetrations into the area of cold storage shall be inspected. If an ice obstruction is found during the inspection, what requirement shall be employed?

#23. Emergency Impairment

#24. Who is qualified to perform the corrections and repairs of a water based fire protection system?

#25. Monitor Nozzles shall be lubricated ________ to ensure proper operating condition?

#26. When there is a ______ percent reduction in full flow pressure when compared to the original acceptance test or previously performed tests, the cause of the reduction shall be identified and corrected if necessary

#27. Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster

#28. Hose Connection

#29. Mechanical waterflow devices, including but not limited to water motor gongs, shall be tested?

#30. What is the minimum operating pressure for any sprinkler?

#31. What chapter of NFPA 25 sets out the administration or scope?

#32. Sprinkler Pipe hangers and seismic bracing shall be inspected?

#33. What is the temperature class and color code for a sprinkler located at a ceiling with a maximum temperature of 150 degrees?

#34. What are the inspection requirements for hangers and seismic braces installed in concealed spaces?

#35. In systems where the sole water supply is through a backflow preventer and/or pressure reducing valves, the main drain test of at least one system downstream of the device shall be conducted on a _________ basis

#36. Sprinklers and automatic spray nozzles used for protecting commercial type cooking equipment and ventilating systems shall be replaced?

#37. What types of impairments are defined in NFPA 25?

#38. Which Chapter covers the minimum requirements of Standpipe & Hose Systems?

#39. Alarm Receiving Facility

#40. What is the minimum time that a fire hydrant should be flowed?

#41. “Shall” Indicates what?

#42. At what minimum interval should exposed pipe, fittings, and sprinkler heads be visually inspected?

#43. Gauges shall be replaced every _____yrs or tested every _____yrs by comparison with a calibrated gauge

#44. Hose Station

#45. Parallel and angular alignment of the pump and driver shall be checked during the _____ test, and any misalignment shall be corrected

#46. After the testing and reinstallation of plugs and caps for auxiliary drain and test valves, what action is required?

#47. When conducting a hydrostatic flow test for a new fire sprinkler system, the test pressure should be _______ psi for ________ hours

#48. At what point on the antifreeze system should the test sample be taken?

#49. Main drain test shall be conducted _______ at each water-based fire protection system riser to determine whether there has been a change in the condition of the water supply piping and control valves

#50. Identify what type of sprinkler is designed to be installed in such a way that the water stream is directed downward against the deflector

#51. The electric pump shall run a minimum of?

#52. This complex phenomenon specific to pumps or other hydraulic equipment is the result of suction pressure falling below vapor pressure corresponding to the water temperature

#53. Are alternative nondestructive examination methods for internal obstructive inspections permitted?

#54. Which of the following is identified as the OSHA control of energy source standard?

#55. Hose Nozzle

#56. A monthly external inspection of a dry valve’s intermediate chamber should indicate?

#57. The hydraulic design information sign for hydraulically designed systems shall be inspected?

#58. If an explosive actuated tool misfires, you should?

#59. Which three types of sprinkler systems could be installed in an unheated area?

#60. Conventional Pin Rack

#61. What type of antifreeze solution should be utilized in CPVC piping?

#62. Choose all that apply to a Dry Pipe System (Select Three)

Select all that apply:

#63. Control Mode Specific Application (CMSA) Sprinkler

#64. When using compressed air for cleaning, it should be rated at less than ______ PSI?

#65. Types of systems

#66. A standpipe system with no permanently attached water supply that relies exclusively on the fire department connection to supply the system demand is called

#67. Sprinklers installed in concealed spaces such as above ceilings shall what?

#68. Automatic Detection Equipment

#69. In a water flow test using two hydrants, _________ pressure is the pressure at the hydrant where the water is not flowing

#70. In a water flow test using two hydrants, ______ pressure is the pressure at the hydrant where the water is not flowing

#71. Ordinary Hazard is a term that specifies

#72. Factors that define Occupancy Group Hazard 2 include

#73. A reduction of ______ percent of pressure during a main drain test must be identified and corrected

#74. What table references the required action whenever a component in a fire sprinkler system is adjusted, repaired, reconditioned, or replaced?

#75. Tanks not equipped with supervised water level alarms connected to a constantly attended location shall be inspected?

#76. Determine the maximum spacing permitted for an Extra Hazard hydraulically calculated system with a density less than 0.25 gpm/ft²

#77. Ordinary Hazard is a term that specifies

#78. Which of the following standards contain requirements pertaining to the installation of underground piping?

#79. Waterflow alarm and supervisory alarm devices shall be inspected?

#80. A basic contract: (choose all that apply)

Select all that apply:

#81. Tank heating systems without a supervised low temperature alarm connected to a constantly attended location shall be inspected ______ during the heating season

#82. Sprinklers installed in areas that are inaccessible for safety consideration, due to process operations ____ be ____ during each scheduled shutdown?

#83. Expansion joints, where provided, shall be inspected _________ for leaks and cracks

#84. When there is a _________ percent reduction in full flow pressure, when compared to original acceptance test, the cause of the reduction shall be identified and corrected

#85. What best describes a tree system?

#86. The area surrounding the tank and supporting structure, where provided, shall be inspected _______ to ensure that the following conditions are met

#87. Recessed Sprinkler

#88. Impairment

#89. ITM Service

#90. Water flow test information should be included on what set of plans?

#91. Hydrostatic Test

#92. Per NFPA 25, all preplanned impairments shall be authorized by?

#93. Where air pressure supervision is connected to a constantly attended location gauges shall be inspected ______?

#94. Where sprinklers are subjected to harsh environments, including corrosive atmospheres and corrosive water supplies, on a five-year basis, they shall be?

#95. Corrosion Resistant Sprinkler

#96. When test results show that the premix antifreeze solution is at the incorrect freeze point, what action shall be taken?

#97. Per NFPA 25, the dry pipe valve shall be externally inspected?

#98. Sprinklers shall be inspected when and how?

#99. What should be included on the list of fire sprinklers required at the spare sprinkler head box?

#100. Wall Hydrant

#101. Manual Operation

#102. Sprinkler pipe and fittings shall be inspected from where and when?

#103. Monitor Nozzle

#104. Sprinklers subject to overspray accumulation shall be protected using cellophane bags having a thickness of ___________ or less or thin paper bags?

#105. Pendent Sprinkler

Previous
Finish